Present: Andrew, Henry, Simon, Wim, Zac

Agenda

  • Goals for next two weeks
  • Get network cables
  • project description
  • Inspections:
  • Do we want time between each inspection? Set up time?
  • Location? All dsl Annex?
  • Extraneous to ask Andrew: See if we can get the LaTeX for the RTL description from last years hardware assignment.

Notes

  • Fix up the project description by the end of the week. Examiners will have read the description beforehand so it's important that we don't look bad. Either that or everyone just says at the start that they
  • Breaks between inspections so that we have time to play with our setups.
  • Practice inspection to be planned at some point with abs.
  • ProTips(tm), inspection: Be prepared to explain why you made decisions. Understand how the things you do work. Have a specification so you can show which boxes you can tick.

Deliverables

  • Project description rewrite