-
Notifications
You must be signed in to change notification settings - Fork 3
Infrastructure
Stefani Gerber edited this page Oct 26, 2017
·
15 revisions
What | Amount needed | Who brings it |
---|---|---|
Couches | 5 | get from 6th floor (put back on 5th and 6th floor) |
Tables | ~44 | floor ? to ?; two will fit into a lift at a time (put back to the same place) |
Fridge | 1 | on 6th floor |
Post-Its ohne Kleber für Glaswände | Matthias / Baloise | |
Adapters to connect to beamer | private |
What | Amount needed | Who brings it |
---|---|---|
Extension cables | 150 plug spaces | Baloise and private (Steffi ~3 extension cables, ~4 Stromschienen) |
Flip-charts | ? | Marina will check at HGK |
Sitzgelegenheiten (z.B. aufblasbar) | 5-10 | Marina |
Ergonomische Hardware (Maus, Bildschirm) | nice to have | private if we can |
Audioverstärkung gross | 1 | Bereits vorhanden an der HGK |
Audioverstärkung klein | 2 | kann nicht schaden, Chris bring 2 kleine Comboamps, Mikrofon, 3,5 mm Klinkenanschluss) |
Papierrolle 60cm breit, lang: Papier flach auf Tische statt auf flipcharts | 1 | Basel Area Swiss |
Malerklebband | 10 | Basel Area Swiss |
Stifte für Flipcharts | mind. 2 pro Team | Basel Area Swiss |
Tables (Festbänke) | 6 rented from Rupp https://github.com/BaselHack/verein/issues/59 |
- BaselHack Event
- People
- Meeting Minutes