-
Notifications
You must be signed in to change notification settings - Fork 10
Teleconference 4.10.2022.
Anna Milan edited this page Oct 31, 2022
·
15 revisions
- Opening and approval of agenda
- Secretariat updates
- Daycli announcement (Denis)
- Review of GRIB proposals
- Review of BUFR proposals
- Review of Common Code Tables proposals
- Schedule of FT2023-1
- AOB
The team discussed the following proposals. All notes are in the comment section of each issue.
The list of issues proposed so far, divided into substantial ones and those with editorial nature.
No. | GRIB2 | Issue | Assignee |
---|---|---|---|
1. | Issue 167 | New section 4 templates to encode 2D wave spectra and wave parameters selected by wave period | Sebastien |
2. | Issue 166 | GRIB2_Template_4_91_ProductDefinitionTemplate_en.csv: Possible off-by-one error in description | Sebastien |
3. | Issue 157 | Categories 8-12 are defined in Common Code Table 4.1 but are not used in Code Table | |
4. | Issue 89 | Surface adjusted wind (UK) | Richard |
5. | Issue 168 | Lost wave parameters in Code Table 4.2 during Fast Track 2019-1 | Sebastien |
6. | Issue 169 | New section 4 templates to encode anomalies, significance and other products in relation with a reference period | Sebastien |
The list of issues under consideration, divided into substantial ones and those with editorial nature.
No. | BUFR4 | Issue | Assignee |
---|---|---|---|
1. | Issue 78 | Proposal for BUFRCREX_CodeFlag_en_40.csv | Simon |
The list of issues under consideration, divided into substantial ones and those with editorial nature.
No. | CCT | Issue | Assignee |
---|---|---|---|
1. | Issue 108 | Change name of Turkey | |
2. | Issue 110 | Additions to Common Code Table C-3 Instrument make and type for water temperature profile measurements | |
3. | Issue 113 | C08.csv, new entry to identify GEMS and OMPS-limb instruments | Marijana |
- When a new proposal (issue) is created, the issue is generally assigned to the person who makes the proposal and put in "submitted" status.
- Once the team agrees to the general approach and decides to go to validation status, chair moves the issue to "in validation" status and the Secretariat creates a branch. If further discussion is necessary, the issue is moved to "in discussion" status.
- Once the team agrees to the final proposal, asignee consolidates the finalized the proposal in the original post, updates the branch, and post a comment saying "branch updated" with mention to Chair and the Secretariat. (Please do not change issue status.)
- Chair confirms that the proposal is finalized and the associated branch is updated, and moved the issue to the "validated" status.
- One-hour meeting to confirm schedule: September 22, 11-12 UTC
- Deadline for submission of proposals: October 3
- Two 2-hour meetings to review new proposals: October 4-5, 12-14 UTC
- Two 2-hour meetings to conclude the proposals: November 1, 12-14 UTC and November 2, 13:30-15 UTC
- Deadline for validation (if not completed by the meeting above): December 2
- Two 2-hour meetings to finalize remaining issues if necessary : December 6-7, 12-14 UTC
- Finalize all proposals - mid January 2023
- National Focal Point review: first of February 2023
- WMO adoption process: first of April 2023
- Codes are officially operational: mid-May 2023
No. | Name | Agency | October 4 |
---|---|---|---|
1 | Jeffrey ATOR | NOAA | X |
2 | Marijana CREPULJA | ECMWF | X |
3 | Simon Stuart ELLIOTT | EUMETSAT | |
4 | Sergio Henrique Soares FERREIRA | National Institute for Space Research, Brazil | X |
5 | Tom KRALIDIS | Environment and Climate Change Canada | |
6 | Sibylle KREBBER | DWD | X |
7 | Abderrazak LEMKHENTER | Météo Maroc | |
8 | Marian MAJAN | HMEI | X |
9 | Sébastien VILLAUME | ECMWF | X |
10 | Richard WEEDON | Met office | |
11 | XUE Lei | CMA | |
12 | Antoine MERLE | EUMETSAT | |
13 | Enrico FUCILE | WMO Secretariat | |
14 | Anna MILAN | WMO Secretariat | |
15 | David BERRY | WMO Secretariat |