User story
As PSD, we would like to implement the existing story DPL-811 Transfer PBMC isolations into FluidX tube racks using the versioned TubeRack model to introduce proper TubeRack support and use it as a reference implementation. This story depends on a set of smaller stories.
Who are the primary contacts for this story
Abdullah, Katy, Andrew
Who is the nominated tester for UAT
TBD
Acceptance criteria
To be considered successful the solution must allow:
DPL-811 acceptance criteria using the TubeRack model
Update of the integration suite with checks for LRC Bank Seq and LRC Bank Spare tube racks
Dependencies
This story is blocked by the following dependencies:
The versioned tube rack model is researched in DPL-1011 Re-use of tube racks and the model is summarised in the Google Document DPL-1011 Re-use of tube racks
yoldas
changed the title
Y24-088 Implement DPL-811 Transfer PBMC Isolations into FluidX tube racks using the versioned TubeRack model
Y24-088 Implement (Banking) DPL-811 Transfer PBMC Isolations into FluidX tube racks using the versioned TubeRack model
May 28, 2024
User story
As PSD, we would like to implement the existing story DPL-811 Transfer PBMC isolations into FluidX tube racks using the versioned TubeRack model to introduce proper TubeRack support and use it as a reference implementation. This story depends on a set of smaller stories.
Who are the primary contacts for this story
Abdullah, Katy, Andrew
Who is the nominated tester for UAT
TBD
Acceptance criteria
To be considered successful the solution must allow:
Dependencies
This story is blocked by the following dependencies:
References
This story has a non-blocking relationship with:
Additional context
The versioned tube rack model is researched in DPL-1011 Re-use of tube racks and the model is summarised in the Google Document DPL-1011 Re-use of tube racks
This story is part of re-implementation of DPL-811 Transfer PBMC isolations into FluidX tube racks (Banking) using the versioned tube rack model.
Story relationships are shown in the Lucidchart diagram TubeRack Stories .
The release of the implementation of this story depends on completion of the dependencies.