You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
User story
As PSD, we would like to implement the existing story DPL-914 Create tube rack containing banked PBMC tubes using the versioned TubeRack model to introduce proper TubeRack support and use it as a reference implementation. This story depends on a set of smaller stories.
Who are the primary contacts for this story
Abdullah, Katy, Andrew
Who is the nominated tester for UAT
TBD
Acceptance criteria
To be considered successful the solution must allow:
DPL-914 Create tube rack containing banked PBMC tubes acceptance criteria using the TubeRack model
Update of the integration suite with checks for LRC PBMC Cryostor tube rack
Dependencies
This story is blocked by the following dependencies:
Additional context
The versioned tube rack model is researched in DPL-1011 Re-use of tube racks and the model is summarised in the Google Document DPL-1011 Re-use of tube racks
User story
As PSD, we would like to implement the existing story DPL-914 Create tube rack containing banked PBMC tubes using the versioned TubeRack model to introduce proper TubeRack support and use it as a reference implementation. This story depends on a set of smaller stories.
Who are the primary contacts for this story
Abdullah, Katy, Andrew
Who is the nominated tester for UAT
TBD
Acceptance criteria
To be considered successful the solution must allow:
Dependencies
This story is blocked by the following dependencies:
References
This story has a non-blocking relationship with:
Additional context
The versioned tube rack model is researched in DPL-1011 Re-use of tube racks and the model is summarised in the Google Document DPL-1011 Re-use of tube racks
This story is part of re-implementation of Create tube rack containing banked PBMC tubes (Defrosting) using the versioned tube rack model.
Story relationships are shown in the Lucidchart diagram TubeRack Stories .
This story does not have a separate Sequencescape API and Transfer Requests dependency. It relies on the story Y24-088 Implement (Banking) DPL-811 Transfer PBMC Isolations into FluidX tube racks using the versioned TubeRack model for those features.
The release of the implementation of this story depends on completion of the dependencies.
The text was updated successfully, but these errors were encountered: