Finalized CI refactoring #690
centos-and-fedora.yml
on: pull_request
Matrix: package-source
Matrix: tests
Matrix: package
Matrix: rpm-tests
Annotations
5 errors
CentOS 8 [CC clang; backend Botan 2.18.2; gpg stable; build sanitize; SM2 Off; IDEA ]
Process completed with exit code 8.
|
RPM test on CentOS 7
Canceling since a higher priority waiting request for 'centos-and-fedora--maxirmx-finalize-ci-refactoring' exists
|
RPM test on CentOS 7
The operation was canceled.
|
CentOS 8 [CC gcc; backend Botan 2.18.2; gpg stable; build normal; SM2 Off; IDEA ]
Canceling since a higher priority waiting request for 'centos-and-fedora--maxirmx-finalize-ci-refactoring' exists
|
CentOS 8 [CC gcc; backend Botan 2.18.2; gpg stable; build normal; SM2 Off; IDEA ]
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
RPM CentOS 7
Expired
|
550 KB |
|
RPM CentOS 8
Expired
|
637 KB |
|
RPM CentOS 9
Expired
|
645 KB |
|
RPM Fedora 35
Expired
|
642 KB |
|
RPM Fedora 36
Expired
|
642 KB |
|
SRPM CentOS 7
Expired
|
3.02 MB |
|
SRPM CentOS 8
Expired
|
3.03 MB |
|
SRPM CentOS 9
Expired
|
3.03 MB |
|
SRPM Fedora 35
Expired
|
3.03 MB |
|
SRPM Fedora 36
Expired
|
3.03 MB |
|
tests
Expired
|
19.3 KB |
|