Wrapping a Kaldi instance (https://github.com/brandeis-llc/aapb-pua-kaldi-docker) to a CLAMS app.
General user instructions for CLAMS apps is available at CLAMS Apps documentation.
The underlying Kaldi instance was originally built for and delivered as a Docker image. Therefore, the system requirements are basically the same as the Docker image. Namely,
- Enough disk space (Image size is 12GB compressed, 24GB uncompressed).
- Enough RAM assigned to the container library. At least 6GB. The more, the better.)