Skip to content

Latest commit

 

History

History
17 lines (10 loc) · 640 Bytes

README.md

File metadata and controls

17 lines (10 loc) · 640 Bytes

AAPB-PUA Kaldi Wrapper

Description

Wrapping a Kaldi instance (https://github.com/brandeis-llc/aapb-pua-kaldi-docker) to a CLAMS app.

User instruction

General user instructions for CLAMS apps is available at CLAMS Apps documentation.

System requirements

The underlying Kaldi instance was originally built for and delivered as a Docker image. Therefore, the system requirements are basically the same as the Docker image. Namely,

  • Enough disk space (Image size is 12GB compressed, 24GB uncompressed).
  • Enough RAM assigned to the container library. At least 6GB. The more, the better.)