[DPE-4816] Add jinja2 as a dependency #2885
ci.yaml
on: pull_request
Build charm
/
Collect bases for charm | .
19s
Lint
/
Lint .github/workflows/
7s
Lint
/
tox run -e lint
18s
Unit test charm
38s
Matrix: Build charm / build
Matrix: integration-test
Annotations
1 error and 1 warning
Integration test charm | 3.1.8 | amd64 / ha_tests/test_self_healing.py | group 1
Process completed with exit code 1.
|
Tests
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
logs-intergration-test-charm-lxd-juju-3.1.8-amd64-ha_tests-test_self_healing.py-group-1
Expired
|
147 KB |
|