Skip to content
Triggered via push December 10, 2023 09:31
Status Failure
Total duration 4m 18s
Artifacts

build-ros.yml

on: push
Matrix: build_docker
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build_docker (rolling)
Process completed with exit code 1.
build_docker (iron)
The job was canceled because "rolling" failed.
build_docker (iron)
The operation was canceled.
build_docker (noetic)
The job was canceled because "rolling" failed.
build_docker (noetic)
The operation was canceled.
build_docker (humble)
The job was canceled because "rolling" failed.
build_docker (humble)
The operation was canceled.