Skip to content

[Docs] Remove PDF build from Readtehdocs (#9347) #59

[Docs] Remove PDF build from Readtehdocs (#9347)

[Docs] Remove PDF build from Readtehdocs (#9347) #59

Triggered via push October 14, 2024 20:20
Status Failure
Total duration 6h 0m 44s
Artifacts

publish.yml

on: push
Create Release
6s
Create Release
Matrix: Build Wheel
Fit to window
Zoom out
Zoom in

Annotations

15 errors
Build Wheel (ubuntu-20.04, 3.12, 2.4.0, 11.8)
Process completed with exit code 1.
Build Wheel (ubuntu-20.04, 3.8, 2.4.0, 11.8)
Process completed with exit code 1.
Build Wheel (ubuntu-20.04, 3.9, 2.4.0, 11.8)
Process completed with exit code 1.
Build Wheel (ubuntu-20.04, 3.11, 2.4.0, 11.8)
Process completed with exit code 1.
Build Wheel (ubuntu-20.04, 3.10, 2.4.0, 11.8)
Process completed with exit code 1.
Build Wheel (ubuntu-20.04, 3.12, 2.4.0, 12.1)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 360 minutes.
Build Wheel (ubuntu-20.04, 3.12, 2.4.0, 12.1)
The operation was canceled.
Build Wheel (ubuntu-20.04, 3.11, 2.4.0, 12.1)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 360 minutes.
Build Wheel (ubuntu-20.04, 3.11, 2.4.0, 12.1)
The operation was canceled.
Build Wheel (ubuntu-20.04, 3.10, 2.4.0, 12.1)
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 360 minutes.
Build Wheel (ubuntu-20.04, 3.10, 2.4.0, 12.1)
The operation was canceled.
Build Wheel (ubuntu-20.04, 3.9, 2.4.0, 12.1)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 360 minutes.
Build Wheel (ubuntu-20.04, 3.9, 2.4.0, 12.1)
The operation was canceled.
Build Wheel (ubuntu-20.04, 3.8, 2.4.0, 12.1)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
Build Wheel (ubuntu-20.04, 3.8, 2.4.0, 12.1)
The operation was canceled.