Skip to content

Refactoring

Refactoring #31

Triggered via push November 21, 2024 14:16
Status Failure
Total duration 9m 14s
Artifacts

check.yml

on: push
Matrix: psalm
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (8.2, highest)
Process completed with exit code 1.
test (8.2, locked)
The job was canceled because "_8_2_highest" failed.
test (8.2, locked)
The operation was canceled.
test (8.3, locked)
The job was canceled because "_8_2_highest" failed.
test (8.3, locked)
The operation was canceled.
test (8.3, highest)
The job was canceled because "_8_2_highest" failed.
test (8.3, highest)
The operation was canceled.
test (8.2, lowest)
The job was canceled because "_8_2_highest" failed.
test (8.2, lowest)
The operation was canceled.
test (8.3, lowest)
The job was canceled because "_8_2_highest" failed.
test (8.3, lowest)
The operation was canceled.