Fix adata copy (coarse transition matrix) #789
Triggered via pull request
September 15, 2024 14:19
Status
Failure
Total duration
6h 0m 41s
Artifacts
–
Annotations
11 errors
test (ubuntu-latest, 3.10, slepc)
Process completed with exit code 1.
|
test (ubuntu-latest, 3.11, noslepc)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 360 minutes.
|
test (ubuntu-latest, 3.11, noslepc)
The operation was canceled.
|
test (ubuntu-latest, 3.12, noslepc)
The job running on runner GitHub Actions 46 has exceeded the maximum execution time of 360 minutes.
|
test (ubuntu-latest, 3.12, noslepc)
The operation was canceled.
|
test (ubuntu-latest, 3.10, noslepc)
The job running on runner GitHub Actions 42 has exceeded the maximum execution time of 360 minutes.
|
test (ubuntu-latest, 3.10, noslepc)
The operation was canceled.
|
test (macos-14, 3.10, noslepc)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
|
test (macos-14, 3.10, noslepc)
The operation was canceled.
|
test (ubuntu-latest, 3.9, noslepc)
The job running on runner GitHub Actions 48 has exceeded the maximum execution time of 360 minutes.
|
test (ubuntu-latest, 3.9, noslepc)
The operation was canceled.
|