.github/workflows/build-and-unit-tests-wrapper.yaml #28
build-and-unit-tests-wrapper.yaml
on: workflow_dispatch
Matrix: build-artifact / build-artifact
Matrix: sd-unit-tests / unit-tests-slow-dispatch
Annotations
6 errors
sd-unit-tests / grayskull E150
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
sd-unit-tests / grayskull E150
The operation was canceled.
|
sd-unit-tests / grayskull E150
The action 'Run pre/post regression tests' has timed out after 15 minutes.
|
sd-unit-tests / wormhole_b0 N300
The self-hosted runner: tt-metal-ci-vm-35 lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
sd-unit-tests / wormhole_b0 N300
The action 'Run pre/post regression tests' has timed out after 15 minutes.
|
sd-unit-tests / wormhole_b0 N150
The run was canceled by @TT-billteng.
|