Skip to content

L2 builder preparation #171

L2 builder preparation

L2 builder preparation #171

Triggered via pull request August 29, 2024 10:18
Status Failure
Total duration 9m 5s
Artifacts

lint.yml

on: pull_request
Matrix: clippy-binaries
Matrix: msrv
lint success
5s
lint success
Fit to window
Zoom out
Zoom in

Annotations

23 errors
no-test-deps
Process completed with exit code 1.
fmt
Process completed with exit code 1.
codespell: packages/protocol/pnpm-lock.yaml#L1451
vEw ==> view, vow, vex
codespell: packages/protocol/test/TaikoTest.sol#L9
thirdparty ==> third party, third-party
codespell: packages/protocol/test/L1/TaikoL1.t.sol#L39
enought ==> enough
codespell: packages/protocol/test/L1/TaikoL1.t.sol#L81
enought ==> enough
MSRV / ethereum
Process completed with exit code 101.
book
Process completed with exit code 101.
MSRV / optimism
The job was canceled because "reth_ethereum" failed.
MSRV / optimism
The operation was canceled.
clippy / ethereum
Process completed with exit code 101.
clippy
Process completed with exit code 101.
clippy / optimism
The job was canceled because "reth_ethereum" failed.
clippy / optimism
Process completed with exit code 101.
docs
Process completed with exit code 101.
crate-checks
Process completed with exit code 1.
lint success
Process completed with exit code 1.