Skip to content

include openssl/crypto.h and resolve conflict varible for ntru #5

include openssl/crypto.h and resolve conflict varible for ntru

include openssl/crypto.h and resolve conflict varible for ntru #5

Triggered via push September 21, 2024 08:46
Status Cancelled
Total duration 13m 8s
Artifacts

push.yml

on: push
basic-checks  /  Check validity of GitHub workflows
1m 1s
basic-checks  /  Check code formatting
1m 18s
basic-checks  /  Check upstream code is properly integrated
2m 13s
basic-checks  /  Check that code passes a basic build
0s
downstream-release-tests  /  oqs-provider-release-test
full-tests  /  ...  /  linux_openssl330-dev
full-tests  /  ...  /  scan_build
Matrix: extended-tests / constant-time-x64
Waiting for pending jobs
Matrix: extended-tests / nistkat-x64
Waiting for pending jobs
Matrix: full-tests / android-tests / android
Waiting for pending jobs
Matrix: full-tests / ios-tests / apple-mobile
Waiting for pending jobs
Matrix: full-tests / linux-tests / linux
Waiting for pending jobs
Matrix: full-tests / linux-tests / linux_arm_emulated
Waiting for pending jobs
Matrix: full-tests / linux-tests / linux_cross_compile
Waiting for pending jobs
Matrix: full-tests / macos-tests / macos
Waiting for pending jobs
Matrix: full-tests / windows-tests / windows-arm64
Waiting for pending jobs
Matrix: full-tests / windows-tests / windows-x86
Waiting for pending jobs
Matrix: full-tests / zephyr-tests / zephyr_test
Waiting for pending jobs

Annotations

3 errors
basic-checks / Check code formatting
Process completed with exit code 1.
basic-checks / Check upstream code is properly integrated
Canceling since a higher priority waiting request for 'Push tests-refs/heads/0.11.0-rc1-branch' exists
basic-checks / Check upstream code is properly integrated
The operation was canceled.