Skip to content

the next lexical

the next lexical #298

Re-run triggered March 15, 2024 22:07
Status Cancelled
Total duration 31s
Artifacts

test.yml

on: push
Matrix: Build and test
Fit to window
Zoom out
Zoom in

Annotations

18 errors
Build and test (25.1)
The job was canceled because "_25_3" failed.
Build and test (24.5)
The job was canceled because "_25_3" failed.
Build and test (26.1)
The job was canceled because "_25_3" failed.
Build and test (27.1)
The job was canceled because "_25_3" failed.
Build and test (25.3)
Process completed with exit code 2.
Build and test (25.2)
The job was canceled because "_25_3" failed.
Build and test (25.2)
Process completed with exit code 2.
Build and test (24.4)
The job was canceled because "_25_3" failed.
Build and test (26.2)
The job was canceled because "_25_3" failed.
Build and test (24.4)
Process completed with exit code 2.
Build and test (28.1)
The job was canceled because "_25_3" failed.
Build and test (26.2)
The operation was canceled.
Build and test (snapshot)
The job was canceled because "_25_3" failed.
Build and test (28.2)
The job was canceled because "_25_3" failed.
Build and test (29.1)
The job was canceled because "_25_3" failed.
Build and test (28.2)
The operation was canceled.
Build and test (29.2)
The job was canceled because "_25_3" failed.
Build and test (26.3)
Process completed with exit code 2.