optimizing build conditions to reduce RHTAP workloads #148
Red Hat Konflux / Red Hat Trusted App Pipeline / ctlog-verify-fulcio-0-6-on-pull-request
failed
Nov 30, 2023 in 1h 0m 2s
Failed
Red Hat Trusted App Pipeline/ctlog-verify-fulcio-0-6-on-pull-request has failed.
Details
Status | Duration | Name |
---|---|---|
✅ Succeeded | 52 seconds | |
✅ Succeeded | 25 seconds | |
✅ Succeeded | 27 seconds | |
❌ Failed | 7 minutes |
Failure reason
task build-container has the status "TaskRunCancelled":
TaskRun "ctlog-verify-fulcio-0-6-on-pull-request-88c6b-build-container" was cancelled. TaskRun cancelled as the PipelineRun it belongs to has timed out.
Loading