Initial creation. #1
ci.yml
on: push
ci
/
Check code style
27s
ci
/
Golint Checking
31s
ci
/
REUSE Checking
33s
ci
/
License Checking
2m 51s
ci
/
Build & Test & Report Coverage
51s
ci
/
Update goreportcard.com
32s
Matrix: ci / Build & Test
ci
/
All checks passed check.
16s
Annotations
9 errors
ci / Build & Test (macos-latest, 1.19)
Process completed with exit code 1.
|
ci / Build & Test (ubuntu-latest, 1.19)
The job was canceled because "macos-latest_1_19" failed.
|
ci / Build & Test (ubuntu-latest, 1.19)
Process completed with exit code 1.
|
ci / Build & Test (windows-latest, 1.19)
The operation was canceled.
|
ci / Build & Test (windows-latest, 1.18)
The operation was canceled.
|
ci / Build & Test (ubuntu-latest, 1.18)
The job was canceled because "macos-latest_1_19" failed.
|
ci / Build & Test (ubuntu-latest, 1.18)
The operation was canceled.
|
ci / Build & Test (macos-latest, 1.18)
The job was canceled because "macos-latest_1_19" failed.
|
ci / Build & Test (macos-latest, 1.18)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
licensing
Expired
|
116 Bytes |
|