Skip to content

CI

CI #136

Triggered via schedule December 27, 2024 04:27
Status Failure
Total duration 6m 57s
Artifacts

ci.yml

on: schedule
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 4 warnings
test (macos-latest, 22)
Process completed with exit code 1.
test (ubuntu-latest, latest)
The job was canceled because "macos-latest_22" failed.
test (ubuntu-latest, latest)
The operation was canceled.
test (ubuntu-latest, 22)
The job was canceled because "macos-latest_22" failed.
test (ubuntu-latest, 22)
The operation was canceled.
test (windows-latest, 22)
The job was canceled because "macos-latest_22" failed.
test (windows-latest, 22)
The operation was canceled.
test (macos-latest, latest)
The job was canceled because "macos-latest_22" failed.
test (macos-latest, latest)
The operation was canceled.
test (windows-latest, latest)
The job was canceled because "macos-latest_22" failed.
test (windows-latest, latest)
The operation was canceled.
lint
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
lint: src/core/formatter/console.js#L182
Async method 'notify' has too many statements (53). Maximum allowed is 50. (eslint.max-statements)
analyze
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
coverage
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636