Still root causing the fused l2 nn issue #3186
pr.yaml
on: push
Matrix: devcontainer / build
Matrix: conda-cpp-build / build
Matrix: wheel-build-pylibraft / build
Matrix: conda-cpp-tests / tests
Waiting for pending jobs
Matrix: conda-python-build / build
Waiting for pending jobs
Matrix: wheel-tests-pylibraft / test
Matrix: conda-python-tests / tests
Waiting for pending jobs
Matrix: wheel-build-raft-dask / build
Waiting for pending jobs
Matrix: wheel-tests-raft-dask / test
Waiting for pending jobs
pr-builder
/
run
Annotations
13 errors
wheel-tests-pylibraft / 12.0.1, 3.9, arm64, ubuntu20.04, a100
Process completed with exit code 1.
|
wheel-tests-pylibraft / 12.0.1, 3.10, amd64, ubuntu18.04, v100
The job was canceled because "arm64_3_9_12_0_1_ubuntu20" failed.
|
wheel-tests-pylibraft / 12.0.1, 3.10, amd64, ubuntu18.04, v100
The operation was canceled.
|
wheel-tests-pylibraft / 11.8.0, 3.9, amd64, ubuntu18.04, v100
The job was canceled because "arm64_3_9_12_0_1_ubuntu20" failed.
|
wheel-tests-pylibraft / 11.8.0, 3.9, amd64, ubuntu18.04, v100
The operation was canceled.
|
devcontainer / build (amd64, 12.0, pip)
Canceling since a higher priority waiting request for 'pr-refs/heads/pull-request/1904' exists
|
devcontainer / build (amd64, 12.0, pip)
The operation was canceled.
|
devcontainer / build (amd64, 12.0, conda)
Canceling since a higher priority waiting request for 'pr-refs/heads/pull-request/1904' exists
|
devcontainer / build (amd64, 12.0, conda)
The operation was canceled.
|
conda-cpp-build / build (11.8.0, ubuntu22.04, amd64, 3.10)
Canceling since a higher priority waiting request for 'pr-refs/heads/pull-request/1904' exists
|
conda-cpp-build / build (11.8.0, ubuntu22.04, amd64, 3.10)
The operation was canceled.
|
conda-cpp-build / build (11.8.0, ubuntu22.04, arm64, 3.10)
Canceling since a higher priority waiting request for 'pr-refs/heads/pull-request/1904' exists
|
conda-cpp-build / build (11.8.0, ubuntu22.04, arm64, 3.10)
The operation was canceled.
|