Skip to content

Adds EL9 hardening-content per Issue 496 #337

Adds EL9 hardening-content per Issue 496

Adds EL9 hardening-content per Issue 496 #337

Triggered via pull request June 5, 2024 15:44
Status Cancelled
Total duration 28s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 6 warnings
test (8, ash-linux.iavm, ./tests/pillar/test-linux-main) / test
Docker pull failed with exit code 1
test (8, ash-linux.stig, ./tests/pillar/test-linux-main) / test
FailFast: cancelling since parallel instance has failed
test (8, ash-linux.stig, ./tests/pillar/test-linux-main) / test
Docker pull failed with exit code 1
test (8, ash-linux.vendor, ./tests/pillar/test-linux-main) / test
FailFast: cancelling since parallel instance has failed
test (8, ash-linux.vendor, ./tests/pillar/test-linux-main) / test
Docker pull failed with exit code 1
test (7, ash-linux.iavm, ./tests/pillar/test-linux-main) / test
FailFast: cancelling since parallel instance has failed
test (7, ash-linux.iavm, ./tests/pillar/test-linux-main) / test
The operation was canceled.
test (7, ash-linux.vendor, ./tests/pillar/test-linux-main) / test
FailFast: cancelling since parallel instance has failed
test (7, ash-linux.vendor, ./tests/pillar/test-linux-main) / test
The operation was canceled.
test (7, ash-linux.stig, ./tests/pillar/test-linux-main) / test
FailFast: cancelling since parallel instance has failed
test (7, ash-linux.stig, ./tests/pillar/test-linux-main) / test
The operation was canceled.
test (8, ash-linux.iavm, ./tests/pillar/test-linux-main) / test
Docker pull failed with exit code 1, back off 2.152 seconds before retry.
test (8, ash-linux.iavm, ./tests/pillar/test-linux-main) / test
Docker pull failed with exit code 1, back off 7.717 seconds before retry.
test (8, ash-linux.stig, ./tests/pillar/test-linux-main) / test
Docker pull failed with exit code 1, back off 5.098 seconds before retry.
test (8, ash-linux.stig, ./tests/pillar/test-linux-main) / test
Docker pull failed with exit code 1, back off 5.263 seconds before retry.
test (8, ash-linux.vendor, ./tests/pillar/test-linux-main) / test
Docker pull failed with exit code 1, back off 4.809 seconds before retry.
test (8, ash-linux.vendor, ./tests/pillar/test-linux-main) / test
Docker pull failed with exit code 1, back off 4.437 seconds before retry.