Skip to content

[FSSDK-10847] chore: preparing for release 5.1.0 #314

[FSSDK-10847] chore: preparing for release 5.1.0

[FSSDK-10847] chore: preparing for release 5.1.0 #314

Re-run triggered January 10, 2025 17:03
Status Failure
Total duration 30s
Artifacts

ruby.yml

on: pull_request
integration_tests  /  test
3s
integration_tests / test
fullstack_production_suite  /  test
4s
fullstack_production_suite / test
Matrix: unit_tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 3 warnings
unit_tests (3.3.0)
Process completed with exit code 1.
unit_tests (3.1.0)
The job was canceled because "_3_3_0" failed.
unit_tests (3.1.0)
Process completed with exit code 1.
unit_tests (3.0.0)
The job was canceled because "_3_3_0" failed.
unit_tests (3.2.0)
The job was canceled because "_3_3_0" failed.
unit_tests (3.2.0)
The operation was canceled.
unit_tests (3.0.0)
The operation was canceled.
integration_tests / test
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
fullstack_production_suite / test
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
unit_tests (3.3.0)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636