Skip to content

Commit

Permalink
More cleanup of formatting
Browse files Browse the repository at this point in the history
Signed-off-by: John Mertic <[email protected]>
  • Loading branch information
jmertic committed Mar 27, 2020
1 parent 1563788 commit 47060cc
Showing 1 changed file with 2 additions and 4 deletions.
6 changes: 2 additions & 4 deletions zowe_conformance/terms_and_conditions.md
Original file line number Diff line number Diff line change
Expand Up @@ -16,10 +16,8 @@ In this document, these terms have the following meanings:
Together with these terms and conditions, the following documents are part of the Conformance Program, each as updated from time to time:

- "**Test Evaluation Guide**": the conformance testing instructions and requirements for the Conformance Program, available at <https://www.openmainframeproject.org/projects/zowe/conformance/test-evaluation-guide>;
- "**Visual** **Branding Guide**": the Conformance Program Visual Branding Guide, available at <https://www.openmainframeproject.org/projects/zowe/conformance/branding-guide>

- "**Visual Branding Guide**": the Conformance Program Visual Branding Guide, available at <https://www.openmainframeproject.org/projects/zowe/conformance/branding-guide>
- "**Trademark Usage Guidelines**": The Linux Foundation's Trademark Usage Guidelines, available at <https://www.linuxfoundation.org/trademark-usage>; and

- "**Participation Form**": the Conformance Program Participation Form, available at <https://www.openmainframeproject.org/projects/zowe/conformance/participation-form-esign>.

## Introduction
Expand Down Expand Up @@ -71,7 +69,7 @@ The participant must continue to abide by the terms and conditions of the Confor
>
> *Reported Non-Conformance*: If The Linux Foundation subsequently determines or is informed that a Qualifying Offering does not successfully meet the evaluation criteria, then upon written notice from The Linux Foundation the Participant must address any non-conformance concerns raised by The Linux Foundation; successfully pass the corresponding tests and satisfy the applicable criteria; and submit to The Linux Foundation a copy of the new testing results generated by the testing evaluation program and/or confirmations of conformance, as applicable, within 30 days following such notice. Otherwise, the Participant will be subject to the requirements set forth below for removal of the Conformance Marks from that product or service.
>
> *Removal of the Conformance Marks at End of Conformance or Participation*. If a Qualifying Offering ceases to remain conformant with the applicable tests and evaluation criteria, or upon any other termination of participation in the Conformance Program, a Participant may no longer use the Conformance Marks in new materials for that formerly Qualifying Offering, and must remove the Conformance Marks from existing marketing materials and websites for that formerly Qualifying Offering within 30 days.
> *Removal of the Conformance Marks at End of Conformance or Participation*: If a Qualifying Offering ceases to remain conformant with the applicable tests and evaluation criteria, or upon any other termination of participation in the Conformance Program, a Participant may no longer use the Conformance Marks in new materials for that formerly Qualifying Offering, and must remove the Conformance Marks from existing marketing materials and websites for that formerly Qualifying Offering within 30 days.
## Use of the Conformance Marks

Expand Down

0 comments on commit 47060cc

Please sign in to comment.