Bump version to 0.18.0 #419
pr-docker.yaml
on: pull_request
build-image-matrix
5s
Matrix: stage-docker-build
Annotations
16 errors
composer-0-18-0 / configure-build-push
FailFast: cancelling since parallel instance has failed
|
composer-0-18-0 / configure-build-push
The operation was canceled.
|
torch-2-0-1-cu118 / configure-build-push
FailFast: cancelling since parallel instance has failed
|
torch-2-0-1-cu118 / configure-build-push
The operation was canceled.
|
torch-2-1-2-cu121 / configure-build-push
FailFast: cancelling since parallel instance has failed
|
torch-2-1-2-cu121 / configure-build-push
The operation was canceled.
|
torch-1-13-1-cpu / configure-build-push
FailFast: cancelling since parallel instance has failed
|
torch-1-13-1-cpu / configure-build-push
The operation was canceled.
|
composer-0-18-0-cpu / configure-build-push
FailFast: cancelling since parallel instance has failed
|
composer-0-18-0-cpu / configure-build-push
The operation was canceled.
|
torch-2-0-1-cpu / configure-build-push
FailFast: cancelling since parallel instance has failed
|
torch-2-0-1-cpu / configure-build-push
The operation was canceled.
|
torch-2-1-2-cpu / configure-build-push
FailFast: cancelling since parallel instance has failed
|
torch-2-1-2-cpu / configure-build-push
The operation was canceled.
|
torch-2-1-2-cu121-aws / configure-build-push
FailFast: cancelling since parallel instance has failed
|
torch-2-1-2-cu121-aws / configure-build-push
The operation was canceled.
|