Skip to content

internal go contact map #629

internal go contact map

internal go contact map #629

Triggered via pull request December 16, 2024 15:47
Status Failure
Total duration 8m 52s
Artifacts

run_tests.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 2 warnings
docs
Process completed with exit code 1.
build (3.11)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
The operation was canceled.
build (3.9)
The job was canceled because "_3_11" failed.
build (3.9)
The operation was canceled.
build (3.12)
The job was canceled because "_3_11" failed.
build (3.12)
The operation was canceled.
docs
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
lint
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636