Skip to content

Integration Test

Integration Test #921

Manually triggered July 24, 2024 04:57
Status Failure
Total duration 15m 20s
Artifacts 1

test-integration.yaml

on: workflow_dispatch
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
test (participant)
Process completed with exit code 1.
test (room)
The job was canceled because "participant" failed.
test (room)
The operation was canceled.
test (track_composite)
The job was canceled because "participant" failed.
test (track_composite)
The operation was canceled.
build
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2

Artifacts

Produced during runtime
Name Size
livekit~egress~YDC1QK.dockerbuild Expired
212 KB