Skip to content

Automatic merge of 'next' into merge (2023-09-21 19:35) #524

Automatic merge of 'next' into merge (2023-09-21 19:35)

Automatic merge of 'next' into merge (2023-09-21 19:35) #524

Triggered via push September 21, 2023 09:36
Status Failure
Total duration 6h 20m 21s
Artifacts 2
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention
Matrix: kernel
Fit to window
Zoom out
Zoom in

Annotations

5 errors
kernel (ppc64, ppc64_book3e_allmodconfig, fedora-38)
Process completed with exit code 2.
kernel (ppc, ppc32_allmodconfig, fedora-38)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
kernel (ppc, ppc32_allmodconfig, fedora-38)
The operation was canceled.
kernel (ppc64le, ppc64le_allmodconfig, fedora-38)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
kernel (ppc64le, ppc64le_allmodconfig, fedora-38)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
allmodconfig-fedora-38 Expired
114 MB
allyesconfig-fedora-38 Expired
885 MB