WIP: search for EB in Plasticc #417
Triggered via pull request
October 19, 2023 14:52
Status
Failure
Total duration
6h 0m 25s
Artifacts
–
Annotations
6 errors
build (3.9)
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 360 minutes.
|
build (3.9)
The operation was canceled.
|
build (3.11)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
|
build (3.11)
The operation was canceled.
|
build (3.10)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
|
build (3.10)
The operation was canceled.
|