Skip to content

PTEUDO-1524: DB Controller ARC Runner Integration tests #16

PTEUDO-1524: DB Controller ARC Runner Integration tests

PTEUDO-1524: DB Controller ARC Runner Integration tests #16

Triggered via pull request December 17, 2024 22:27
Status Failure
Total duration 22h 21m 23s
Artifacts

integration.yml

on: pull_request
Matrix: integration
Fit to window
Zoom out
Zoom in

Annotations

2 errors
Run on box-3
Process completed with exit code 255.
Run on devops-admin-gcp-dev-usce1
The job was canceled because "box-3" failed.