chore(deps): bump the deps group across 2 directories with 1 update #11188
Triggered via pull request
October 17, 2024 16:39
Status
Failure
Total duration
1h 17m 55s
Artifacts
4
iroha2-dev-pr.yml
on: pull_request
build_wasm_samples
15m 37s
consistency
2m 40s
fmt_and_clippy
13m 11s
pr-generator-build
0s
unit_tests_with_coverage
16m 48s
integration
13m 35s
extra_functional
1h 0m
docker-compose-and-pytests
15m 25s
Annotations
2 errors and 1 warning
extra_functional
The job running on runner i-0cc4bf023735e6a4b has exceeded the maximum execution time of 60 minutes.
|
extra_functional
The operation was canceled.
|
docker-compose-and-pytests
Attestations are only supported by buildx >= 0.10.0; the inputs 'attests', 'provenance' and 'sbom' are ignored.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
executor.wasm
Expired
|
125 KB |
|
report-clippy
Expired
|
85.4 KB |
|
report-coverage
Expired
|
809 KB |
|
wasm_samples
Expired
|
1.74 MB |
|