Await calls in parallel (#1398) #7200
code.yml
on: push
Plan the execution
12s
prettier:check
34s
Matrix: downloadable-utils
Matrix: e2e
Matrix: embedded-utils
Matrix: test
Annotations
12 errors
tests/eth/contractsFactory.ts > contracts factory > builds contracts after emptying the wallet:
utils/e2e-tests/ts/tests/eth/contractsFactory.ts#L87
AssertionError: status of third `build`: expected 'reverted' to be 'success' // Object.is equality
Expected: "success"
Received: "reverted"
❯ tests/eth/contractsFactory.ts:87:61
|
End-to-end tests / base
Process completed with exit code 1.
|
Ubuntu 22.04 / test
Canceling since a higher priority waiting request for 'code-refs/heads/e2e-contract-factories-nonce' exists
|
Ubuntu 22.04 / test
The operation was canceled.
|
Ubuntu 22.04 / build
Canceling since a higher priority waiting request for 'code-refs/heads/e2e-contract-factories-nonce' exists
|
Ubuntu 22.04 / build
The operation was canceled.
|
Ubuntu 22.04 / test benchmark
Canceling since a higher priority waiting request for 'code-refs/heads/e2e-contract-factories-nonce' exists
|
Ubuntu 22.04 / test benchmark
The operation was canceled.
|
Ubuntu 22.04 / build with try-runtime
Canceling since a higher priority waiting request for 'code-refs/heads/e2e-contract-factories-nonce' exists
|
Ubuntu 22.04 / build with try-runtime
The operation was canceled.
|
Ubuntu 22.04 / clippy
Canceling since a higher priority waiting request for 'code-refs/heads/e2e-contract-factories-nonce' exists
|
Ubuntu 22.04 / clippy
The operation was canceled.
|