Skip to content

ASLR: Lay down the foundations #1829

ASLR: Lay down the foundations

ASLR: Lay down the foundations #1829

Triggered via pull request December 10, 2024 19:20
Status Failure
Total duration 6h 0m 21s
Artifacts

ci.yml

on: pull_request
Matrix: Clippy
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 3 warnings
Run images
Process completed with exit code 1.
Test (macos-latest)
Process completed with exit code 101.
Clippy (macos-latest)
Process completed with exit code 101.
Clippy (ubuntu-latest)
The job was canceled because "macos-latest" failed.
Clippy (ubuntu-latest)
The operation was canceled.
Clippy (macos-13, x86_64-apple-darwin, --target x86_64-apple-darwin)
The job was canceled because "macos-latest" failed.
Clippy (macos-13, x86_64-apple-darwin, --target x86_64-apple-darwin)
The operation was canceled.
Coverage
The job running on runner github-runner-4 has exceeded the maximum execution time of 360 minutes.
Coverage
The operation was canceled.
Integration Tests
The job running on runner github-runner-1 has exceeded the maximum execution time of 360 minutes.
Integration Tests
The operation was canceled.
Test (ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Format
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Clippy test-kernels
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636