Skip to content

Preliminary merge of develop to adjust doc links #1334

Preliminary merge of develop to adjust doc links

Preliminary merge of develop to adjust doc links #1334

Triggered via pull request January 30, 2024 21:43
@VisLabVisLab
synchronize #840
develop
Status Failure
Total duration 4m 27s
Artifacts

ci.yaml

on: pull_request
determine_version
0s
determine_version
check-secret
0s
check-secret
Matrix: build
Publish coverage
0s
Publish coverage
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (ubuntu-latest, 3.11)
Process completed with exit code 1.
build (ubuntu-latest, 3.10)
The job was canceled because "ubuntu-latest_3_11" failed.
build (ubuntu-latest, 3.10)
The operation was canceled.
build (ubuntu-latest, 3.9)
The job was canceled because "ubuntu-latest_3_11" failed.
build (ubuntu-latest, 3.9)
The operation was canceled.
build (ubuntu-latest, 3.7)
The job was canceled because "ubuntu-latest_3_11" failed.
build (ubuntu-latest, 3.7)
The operation was canceled.