Skip to content

Commit

Permalink
Update flood-sensor-deployment-manual.md
Browse files Browse the repository at this point in the history
  • Loading branch information
ak6492 authored Dec 12, 2023
1 parent 3207409 commit f238a23
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion deployment/flood-sensor-deployment-manual.md
Original file line number Diff line number Diff line change
Expand Up @@ -47,7 +47,7 @@ This section contains the checklist for necessary tools, hardware, and equipment
| 17 | M8 Lock nut and Lock washer | 4 |
| 18 | M6 Lock nut and Lock washer | 4 |
| 19 | 1.5" Hex head M8 bolts and 1.5" Hex head M6 bolts | 2+2 |
| 20 | Foldable Ladder |1|
| 20 | Portable Foldable Ladder that can allow you to reach heights of upto 6 feet |1|
| 21 | 3" mending plate |1|
### 1.2. Notes on Sensor mount preparation
After we have identified the ideal mounting infrastructure (see [Flood Hotspots Identification](https://github.com/floodnet-nyc/flood-sensor/blob/main/deployment/hotspot%20identification/flood-hotspots-identification.md) document), the next step is to identify the mounting position on the post/pole itself.
Expand Down

0 comments on commit f238a23

Please sign in to comment.