#258: Adapt to Exasol 8.29.1 #461
Annotations
4 errors
matrix-build (8.29.1)
Canceling since a higher priority waiting request for 'CI Build-refs/pull/259/merge-8.29.1' exists
|
matrix-build (8.29.1)
The operation was canceled.
|
matrix-build (7.1.29)
Canceling since a higher priority waiting request for 'CI Build-refs/pull/259/merge-7.1.29' exists
|
matrix-build (7.1.29)
The operation was canceled.
|