Skip to content

fix: open raweth socket on the correct network interface. (#341) #250

fix: open raweth socket on the correct network interface. (#341)

fix: open raweth socket on the correct network interface. (#341) #250

Triggered via push February 8, 2024 11:00
Status Failure
Total duration 1m 6s
Artifacts

build-check.yaml

on: push
Run unit tests on ubuntu-latest
29s
Run unit tests on ubuntu-latest
Check codebase format with clang-format
5s
Check codebase format with clang-format
Check c99 compilation
9s
Check c99 compilation
Build and test in single thread on ubuntu-latest
38s
Build and test in single thread on ubuntu-latest
Test multicast and unicast fragmentation
38s
Test multicast and unicast fragmentation
Matrix: Modular build on ubuntu-latest
Matrix: Build and test raweth transport on ubuntu-latest
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Modular build on ubuntu-latest (1, 1, 1, 1)
Process completed with exit code 1.
Modular build on ubuntu-latest (0, 1, 0, 0)
The job was canceled because "_1_1_1_1" failed.
Modular build on ubuntu-latest (1, 1, 0, 1)
The job was canceled because "_1_1_1_1" failed.
Modular build on ubuntu-latest (1, 0, 1, 0)
The job was canceled because "_1_1_1_1" failed.
Modular build on ubuntu-latest (1, 0, 1, 1)
The job was canceled because "_1_1_1_1" failed.
Modular build on ubuntu-latest (1, 0, 1, 1)
The operation was canceled.
Modular build on ubuntu-latest (1, 0, 0, 0)
The job was canceled because "_1_1_1_1" failed.
Modular build on ubuntu-latest (1, 0, 0, 0)
The operation was canceled.
Modular build on ubuntu-latest (0, 1, 0, 1)
The job was canceled because "_1_1_1_1" failed.
Modular build on ubuntu-latest (0, 1, 0, 1)
The operation was canceled.
Modular build on ubuntu-latest (1, 0, 0, 1)
The job was canceled because "_1_1_1_1" failed.
Modular build on ubuntu-latest (1, 0, 0, 1)
The operation was canceled.