Skip to content

Quality checks and tests #196

Quality checks and tests

Quality checks and tests #196

Triggered via merge group October 19, 2023 16:10
Status Success
Total duration 6m 30s
Artifacts 2

checks.yml

on: merge_group
Prettier  /  check
53s
Prettier / check
Require changeset  /  check
44s
Require changeset / check
Build & publish  /  build
2m 42s
Build & publish / build
ESLint
50s
ESLint
Run publint
32s
Run publint
Run attw
19s
Run attw
Integration (Generic)  /  run
1m 39s
Integration (Generic) / run
Integration (NextJS)  /  run
2m 3s
Integration (NextJS) / run
Integration (Remix)  /  run
30s
Integration (Remix) / run
Matrix: Run unit tests
Fit to window
Zoom out
Zoom in

Annotations

1 error and 3 warnings
Run attw
Process completed with exit code 1.
Integration (Generic) / run
No files were found with the provided path: playwright-report/. No artifacts will be uploaded.
Integration (NextJS) / run
No files were found with the provided path: playwright-report/. No artifacts will be uploaded.
Integration (Remix) / run
No files were found with the provided path: playwright-report/. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
package-artifacts Expired
3.63 MB
verdaccio Expired
3.49 MB