Merge pull request #8 from chef/nikhil/fixing-build-pipeline #62
integration.yml
on: push
Matrix: Linux Dokken Integration Tests
Matrix: MacOS Integration Tests
Matrix: Windows Integration Tests
Annotations
6 errors and 1 warning
Linux Dokken Integration Tests (3.3)
Canceling since a higher priority waiting request for 'integration-refs/heads/main' exists
|
Linux Dokken Integration Tests (3.3)
The operation was canceled.
|
Windows Integration Tests (3.3)
Canceling since a higher priority waiting request for 'integration-refs/heads/main' exists
|
Windows Integration Tests (3.3)
The operation was canceled.
|
MacOS Integration Tests (3.3)
Canceling since a higher priority waiting request for 'integration-refs/heads/main' exists
|
MacOS Integration Tests (3.3)
The operation was canceled.
|
MacOS Integration Tests (3.3)
macOS's Gatekeeper has been disabled for this Cask
|