Skip to content

Fix: LP accounting #343

Fix: LP accounting

Fix: LP accounting #343

Triggered via pull request December 20, 2023 08:57
Status Failure
Total duration 5m 42s
Artifacts

sanity-checks.yml

on: pull_request
Matrix: benchmark-check
Matrix: test-n-lint
Fit to window
Zoom out
Zoom in

Annotations

10 errors
lint-clippy
Process completed with exit code 101.
test-integration
The operation was canceled.
cargo-build
The job was canceled because "lint-clippy" failed.
cargo-build
The operation was canceled.
test-general
The operation was canceled.
docs-build
The job was canceled because "lint-clippy" failed.
docs-build
The operation was canceled.
bench-check-altair
Process completed with exit code 101.
bench-check-centrifuge
The job was canceled because "altair" failed.
bench-check-centrifuge
The operation was canceled.