Test tests/integration/ha_tests/test_functional.py
#2923
Re-run triggered
July 12, 2024 19:08
Status
Failure
Total duration
2h 12m 39s
Billable time
14m
Artifacts
88
ci.yaml
on: pull_request
Build charm
/
Collect bases for charm | .
14s
Lint
/
Lint .github/workflows/
4s
Lint
/
tox run -e lint
17s
Unit test charm
41s
Matrix: Build charm / build
Matrix: integration-test
Annotations
4 errors and 1 warning
Integration test charm | 2.9.49 | amd64 / test_db_admin.py | group 1
Process completed with exit code 1.
|
Integration test charm | 3.1.8 | amd64 / ha_tests/test_functional.py | group 1
Process completed with exit code 1.
|
Integration test charm | 2.9.49 | amd64 / ha_tests/test_functional.py | group 1
Process completed with exit code 1.
|
Integration test charm | 3.1.8 | arm64 / ha_tests/test_functional.py | group 1
The action 'Run integration tests' has timed out after 120 minutes.
|
Tests
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
logs-intergration-test-charm-lxd-juju-2.9.49-amd64-ha_tests-test_functional.py-group-1
Expired
|
106 KB |
|
logs-intergration-test-charm-lxd-juju-2.9.49-amd64-test_db_admin.py-group-1
Expired
|
173 KB |
|
logs-intergration-test-charm-lxd-juju-3.1.8-amd64-ha_tests-test_async_replication.py-group-1
Expired
|
419 KB |
|
logs-intergration-test-charm-lxd-juju-3.1.8-amd64-ha_tests-test_functional.py-group-1
Expired
|
103 KB |
|
logs-intergration-test-charm-lxd-juju-3.1.8-arm64-ha_tests-test_functional.py-group-1
Expired
|
38.3 KB |
|