[DPE-4532] Increase timeout and terminate processes that are still up #2917
ci.yaml
on: pull_request
Build charm
/
Collect bases for charm | .
18s
Lint
/
Lint .github/workflows/
6s
Lint
/
tox run -e lint
18s
Unit test charm
40s
Matrix: Build charm / build
Matrix: integration-test
Annotations
1 warning
Tests
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
logs-intergration-test-charm-lxd-juju-2.9.49-amd64-test_tls.py-group-1
Expired
|
82.5 KB |
|