Tests #1520
ci.yaml
on: schedule
Build charms
/
...
/
Get workflow version
4s
Matrix: Build charms / build
Matrix: integration-test
Annotations
13 errors and 1 warning
db-relation-integration | 2.9.45
Process completed with exit code 1.
|
charm-integration | 2.9.45
Process completed with exit code 1.
|
charm-integration | 3.1.6
Process completed with exit code 1.
|
db-relation-integration | 3.1.6
Process completed with exit code 1.
|
password-rotation-integration | 3.1.6
The process '/usr/bin/sg' failed with exit code 1
|
ha-self-healing-integration | 3.1.6
Process completed with exit code 1.
|
ha-restore-cluster-integration | 2.9.45
Process completed with exit code 1.
|
ha-self-healing-integration | 2.9.45
Process completed with exit code 1.
|
tls-integration | 2.9.45
Process completed with exit code 1.
|
upgrade-integration | 2.9.45
Process completed with exit code 1.
|
upgrade-integration | 3.1.6
Process completed with exit code 1.
|
database-relation-integration | 3.1.6
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 120 minutes.
|
database-relation-integration | 3.1.6
The operation was canceled.
|
db-relation-integration | 2.9.45
You are running out of disk space. The runner will stop working when the machine runs out of disk space. Free space left: 88 MB
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
charms-packed-with-cache
Expired
|
28.4 MB |
|