Update dependency libjuju 2 to v2.9.45.0 - autoclosed #1519
ci.yaml
on: pull_request
Build charms
/
...
/
Get workflow version
7s
Matrix: Build charms / build
Matrix: integration-test
Annotations
14 errors
backup-integration | 2.9.45
Process completed with exit code 1.
|
db-relation-integration | 3.1.6
Process completed with exit code 1.
|
backup-integration | 3.1.6
Process completed with exit code 1.
|
charm-integration | 2.9.45
Process completed with exit code 1.
|
db-relation-integration | 2.9.45
The job running on runner GitHub Actions 1 has exceeded the maximum execution time of 120 minutes.
|
db-relation-integration | 2.9.45
The operation was canceled.
|
ha-self-healing-integration | 2.9.45
Process completed with exit code 1.
|
upgrade-integration | 2.9.45
Process completed with exit code 1.
|
upgrade-integration | 3.1.6
Process completed with exit code 1.
|
tls-integration | 3.1.6
Process completed with exit code 1.
|
db-admin-relation-integration | 2.9.45
Process completed with exit code 1.
|
database-relation-integration | 2.9.45
Process completed with exit code 1.
|
database-relation-integration | 3.1.6
The job running on runner GitHub Actions 40 has exceeded the maximum execution time of 120 minutes.
|
database-relation-integration | 3.1.6
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
charms-packed-with-cache
Expired
|
28.4 MB |
|