Skip to content

Tests

Tests #1482

Triggered via schedule October 21, 2023 01:16
Status Failure
Total duration 5h 15m 47s
Artifacts 1

ci.yaml

on: schedule
Build charms  /  ...  /  Get workflow version
3s
Build charms / Get workflow version / Get workflow version
Build charms  /  Collect charms
13s
Build charms / Collect charms
Matrix: Build charms / build
Matrix: integration-test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
charm-integration | 2.9.45
Process completed with exit code 1.
db-relation-integration | 3.1.6
Process completed with exit code 1.
db-relation-integration | 2.9.45
Process completed with exit code 1.
ha-restore-cluster-integration | 3.1.6
Process completed with exit code 1.
ha-self-healing-integration | 2.9.45
Process completed with exit code 1.
ha-self-healing-integration | 3.1.6
Process completed with exit code 1.
upgrade-integration | 2.9.45
Process completed with exit code 1.
upgrade-integration | 3.1.6
Process completed with exit code 1.
database-relation-integration | 3.1.6
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 120 minutes.
database-relation-integration | 3.1.6
The operation was canceled.

Artifacts

Produced during runtime
Name Size
charms-packed-with-cache Expired
28.4 MB