reinit PostgreSQL only if there is a healthy majority #3488
ci.yaml
on: pull_request
Build charm
/
Collect bases for charm | .
18s
Lint
/
Lint .github/workflows/
6s
Lint
/
tox run -e lint
15s
Unit test charm
5m 14s
Matrix: Build charm / build
Matrix: integration-test
Waiting for pending jobs
Annotations
3 errors
Lint / tox run -e lint
Process completed with exit code 1.
|
Unit test charm
The job running on runner GitHub Actions 84 has exceeded the maximum execution time of 5 minutes.
|
Unit test charm
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
packed-charm-cache-true-.-base-0
|
29 MB |
|
packed-charm-cache-true-.-base-1
|
28.4 MB |
|