Skip to content

[DPE-4977] Run tests against juju 3.6 on a nightly schedule #3

[DPE-4977] Run tests against juju 3.6 on a nightly schedule

[DPE-4977] Run tests against juju 3.6 on a nightly schedule #3

Re-run triggered August 29, 2024 19:41
Status Cancelled
Total duration 14m 2s
Billable time 8m
Artifacts 30

juju_3_6_ci.yaml

on: pull_request
Build charm  /  Collect bases for charm | .
19s
Build charm / Collect bases for charm | .
Lint  /  Lint .github/workflows/
6s
Lint / Lint .github/workflows/
Lint  /  tox run -e lint
17s
Lint / tox run -e lint
Matrix: Build charm / build
Integration | 3.6  /  3.6/beta | amd64 | Collect integration test groups
30s
Integration | 3.6 / 3.6/beta | amd64 | Collect integration test groups
Matrix: Integration | 3.6 / integration-test
Integration | 3.6  /  (beta) Publish Allure report
0s
Integration | 3.6 / (beta) Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

17 errors and 1 warning
Integration | 3.6 / ha_tests/test_restore_cluster.py | group 1
Process completed with exit code 1.
Integration | 3.6 / test_subordinates.py | group 1
Process completed with exit code 1.
Integration | 3.6 / ha_tests/test_smoke.py | group 1
Process completed with exit code 1.
Integration | 3.6 / new_relations/test_new_relations.py | group 2
Process completed with exit code 1.
Integration | 3.6 / ha_tests/test_self_healing.py | group 1
Process completed with exit code 1.
Integration | 3.6 / test_charm.py | group 1
Canceling since a higher priority waiting request for 'Juju 3.6 CI tests-refs/pull/601/merge' exists
Integration | 3.6 / test_charm.py | group 1
The operation was canceled.
Integration | 3.6 / test_backups.py | group 2
Canceling since a higher priority waiting request for 'Juju 3.6 CI tests-refs/pull/601/merge' exists
Integration | 3.6 / test_backups.py | group 2
The operation was canceled.
Integration | 3.6 / test_backups.py | group 1
Canceling since a higher priority waiting request for 'Juju 3.6 CI tests-refs/pull/601/merge' exists
Integration | 3.6 / test_backups.py | group 1
The operation was canceled.
Integration | 3.6 / test_tls.py | group 1
Canceling since a higher priority waiting request for 'Juju 3.6 CI tests-refs/pull/601/merge' exists
Integration | 3.6 / test_tls.py | group 1
The operation was canceled.
Integration | 3.6 / test_db_admin.py | group 1
Canceling since a higher priority waiting request for 'Juju 3.6 CI tests-refs/pull/601/merge' exists
Integration | 3.6 / test_db_admin.py | group 1
The operation was canceled.
Integration | 3.6 / test_backups_pitr.py | group 1
Canceling since a higher priority waiting request for 'Juju 3.6 CI tests-refs/pull/601/merge' exists
Integration | 3.6 / test_backups_pitr.py | group 1
The operation was canceled.
Juju 3.6 CI tests
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.

Artifacts

Produced during runtime
Name Size
logs-integration-test-charm-lxd-juju-3.6-beta-amd64-ha_tests-test_restore_cluster.py-group-1 Expired
905 Bytes
logs-integration-test-charm-lxd-juju-3.6-beta-amd64-ha_tests-test_self_healing.py-group-1 Expired
905 Bytes
logs-integration-test-charm-lxd-juju-3.6-beta-amd64-ha_tests-test_smoke.py-group-1 Expired
907 Bytes
logs-integration-test-charm-lxd-juju-3.6-beta-amd64-new_relations-test_new_relations.py-group-2 Expired
901 Bytes
logs-integration-test-charm-lxd-juju-3.6-beta-amd64-relations-test_relations.py-group-1 Expired
16.6 KB
logs-integration-test-charm-lxd-juju-3.6-beta-amd64-test_subordinates.py-group-1 Expired
893 Bytes