Skip to content

[DPE-4839] Point In Time Recovery (#554) #362

[DPE-4839] Point In Time Recovery (#554)

[DPE-4839] Point In Time Recovery (#554) #362

Re-run triggered July 28, 2024 10:08
Status Failure
Total duration 31m 54s
Billable time 25m
Artifacts 79

release.yaml

on: push
Build charm  /  Collect bases for charm | .
22s
Build charm / Collect bases for charm | .
Tests  /  ...  /  Collect bases for charm | .
21s
Tests / Build charm / Collect bases for charm | .
Tests  /  ...  /  Lint .github/workflows/
6s
Tests / Lint / Lint .github/workflows/
Tests  /  ...  /  tox run -e lint
22s
Tests / Lint / tox run -e lint
Tests  /  Unit test charm
46s
Tests / Unit test charm
Matrix: Build charm / build
Matrix: Tests / Build charm / build
Matrix: Tests / integration-test
Release charm  /  Release charm
Release charm / Release charm
Release libraries
0s
Release libraries
Fit to window
Zoom out
Zoom in

Annotations

1 error and 1 warning
Tests / Integration | 2.9.50 | amd64 / test_backups_pitr.py | group 1
Process completed with exit code 1.
Release to Charmhub
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.

Artifacts

Produced during runtime
Name Size
logs-intergration-test-charm-microk8s-juju-2.9.50-amd64-test_backups_pitr.py-group-1 Expired
91.8 KB