[DPE-4806] Restart pebble service if it's down (#581) #361
release.yaml
on: push
Build charm
/
Collect bases for charm | .
16s
Tests
/
...
/
Collect bases for charm | .
14s
Tests
/
...
/
Lint .github/workflows/
4s
Tests
/
...
/
tox run -e lint
18s
Tests
/
Unit test charm
39s
Matrix: Build charm / build
Matrix: Tests / Build charm / build
Matrix: Tests / integration-test
Release charm
/
Release charm
1m 4s
Release libraries
41s
Annotations
3 warnings
Tests / Integration | 3.4.4 | arm64 / ha_tests/test_upgrade_to_primary_label.py | group 1
Failed to download action 'https://api.github.com/repos/canonical/get-workflow-version-action/tarball/a5d53b08d254a157ea441c9819ea5002ffc12edc'. Error: Response status code does not indicate success: 504 (Gateway Timeout).
|
Tests / Integration | 3.4.4 | arm64 / ha_tests/test_upgrade_to_primary_label.py | group 1
Back off 26.404 seconds before retry.
|
Release to Charmhub
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
logs-intergration-test-charm-microk8s-juju-3.4.4-amd64-test_tls.py-group-1
Expired
|
56.5 KB |
|