Skip to content

Integrate runtime updates for etcd #427

Integrate runtime updates for etcd

Integrate runtime updates for etcd #427

Triggered via pull request April 19, 2024 08:45
Status Cancelled
Total duration 2h 43m 25s
Artifacts 2

integration_test.yaml

on: pull_request
extra-args
0s
extra-args
Matrix: build-all-charms
Matrix: integration-tests
Fit to window
Zoom out
Zoom in

Annotations

6 errors
integration-tests (etcd) / Integration tests / Integration tests
The job running on runner GitHub Actions 391 has exceeded the maximum execution time of 120 minutes.
integration-tests (etcd) / Integration tests / Integration tests
The operation was canceled.
integration-tests (k8s) / Integration tests / Integration tests
The job running on runner GitHub Actions 11 has exceeded the maximum execution time of 120 minutes.
integration-tests (k8s) / Integration tests / Integration tests
The operation was canceled.
integration-tests (etcd) / Required Integration Test Status Checks
Process completed with exit code 1.
integration-tests (k8s) / Required Integration Test Status Checks
FailFast: cancelling since parallel instance has failed

Artifacts

Produced during runtime
Name Size
k8s-charm Expired
3.43 MB
k8s-worker-charm Expired
6.34 MB